公司新聞
hengye
企業(yè)案例
case
聯(lián)系我們
- 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
- 手機(jī):15953126901
- 電話:18615254757
- 郵箱:785385551@qq.com
- 地址:濟(jì)南市天橋區(qū)歷山北路黃臺不銹鋼市場3區(qū)317
鐵藝護(hù)欄安裝時(shí)的八點(diǎn)正確事項(xiàng)
來源:http://www.eastagcn.com.cn 日期:2022-11-01 發(fā)布人: 瀏覽次數(shù):7次
鐵藝護(hù)欄以獨(dú)特的藝術(shù)魅力和、的特性,正日益被人們普遍接受和喜愛。在城市與鄉(xiāng)村,在公共建筑與私宅,或現(xiàn)代,或古典,到處都可以看到形式各異、美輪美奐的金屬鐵藝護(hù)欄。下面來講講濟(jì)南鐵藝護(hù)欄安裝時(shí)的八點(diǎn)正確事項(xiàng)。
Iron railings are increasingly widely accepted and loved by people due to their unique artistic charm, environmental protection and safety characteristics. In cities and villages, in public buildings and private houses, or modern, or classical, you can see beautiful metal railings in various forms everywhere. Now let's talk about the eight correct items for the installation of Jinan Iron Fence.
一、不得在已安裝完成的鐵藝護(hù)欄上涂抹砂漿及掛放雜物。
1、 It is not allowed to apply mortar and hang sundries on the installed iron guardrail.
二、為防污染,在交叉作業(yè)過程中,鐵藝護(hù)欄需蓋上保護(hù)膜。
2、 To prevent pollution, the iron guardrail shall be covered with protective film during cross operation.
三、對已安裝好的鐵藝護(hù)欄再進(jìn)行一次表面清理,修補(bǔ)劃痕,確保表面光滑潔凈。
3、 The surface of the installed iron guardrail shall be cleaned again, and the scratches shall be repaired to ensure that the surface is smooth and clean.
四、施工人員必嚴(yán)格執(zhí)行現(xiàn)場生產(chǎn)規(guī)章制度。進(jìn)入現(xiàn)場要戴好帽、帶、焊接人員必穿好絕緣鞋。施工前必進(jìn)行技術(shù)交底不違章作業(yè),服從人員指揮。
4、 The construction personnel must strictly implement the on-site safety production rules and regulations. When entering the site, safety helmets and safety belts must be worn, and welding personnel must wear insulating shoes. Before construction, safety technical disclosure must be carried out to avoid illegal operations and obey the command of safety personnel.
五、愛護(hù)一切設(shè)施和用具,做到正確使用不隨便拆改,嚴(yán)格遵守操作規(guī)程和一切規(guī)章制度。
5、 Take good care of all safety facilities and appliances, make sure that they are used correctly, do not dismantle or change them randomly, and strictly abide by the operating procedures and all safety rules and regulations.
六、施工現(xiàn)場材料應(yīng)堆放整齊,對每天施工剩下的邊角料進(jìn)行整理、清掃,做到工完料凈場地清。對施工區(qū)域、危險(xiǎn)區(qū)域設(shè)立醒目的警示標(biāo)志,并采取保護(hù)措施。
6、 The materials on the construction site shall be stacked neatly, and the leftover materials left in the daily construction shall be sorted and cleaned to ensure that the materials are clean and the site is clear after the completion of the work. Set up eye-catching warning signs in construction areas and hazardous areas, and take protective measures.
七、焊接時(shí)要設(shè)有專人看護(hù),備好消防器材,焊接結(jié)束即刻查看現(xiàn)場,確定無隱患后,方可撤離現(xiàn)場。
7、 During welding, special personnel shall be assigned to watch over and prepare fire-fighting equipment. After welding, the site shall be checked immediately. Only after no hidden danger is confirmed, the site can be evacuated.
八、采取各種有效措施,降低施工過程中產(chǎn)生的噪音,努力做到施工不擾民。
8、 Various effective measures shall be taken to reduce the noise generated during the construction, and the construction shall not disturb the residents.
此外鐵藝護(hù)欄材料進(jìn)入現(xiàn)場制作安裝之前做防銹處理,制作過程中,定位尺寸要準(zhǔn)確。表面進(jìn)行防銹處理完好后再做面漆處理,保證表面的整潔。更多相關(guān)的注意事項(xiàng)要來我們網(wǎng)站http://www.eastagcn.com.cn進(jìn)行咨詢了解!
In addition, the iron guardrail materials shall be subject to rust prevention treatment before entering the site for fabrication and installation. During the fabrication process, the positioning size shall be accurate. The surface shall be subject to rust prevention treatment before finishing paint treatment to ensure the cleanness of the surface. More relevant precautions should come to our website http://www.eastagcn.com.cn Ask about it!