黑人巨大vs小早川怜子,涩涩视频在线播放,久久久久久无码AV成人影院,日韩天堂在线观看

銷售咨詢熱線
15953126901
18615254757
公司新聞 hengye
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟南燕翔鐵藝制品有限公司
  • 手機:15953126901
  • 電話:18615254757
  • 郵箱:785385551@qq.com
  • 地址:濟南市天橋區(qū)歷山北路黃臺不銹鋼市場3區(qū)317
當前位置: 首頁 > 新聞資訊>公司新聞安裝鐵藝護欄應該注意的哪些問題

安裝鐵藝護欄應該注意的哪些問題

來源:http://www.eastagcn.com.cn 日期:2024-07-04 發(fā)布人: 瀏覽次數(shù):1

一、預埋件設計標高、位置、數(shù)量須符合設計及安裝要求,并經(jīng)防腐防銹處理。埋件不符合要求時,應及時采取有效措施,增補埋件。這一點特別重要,大家也都知道預埋鐵應該開始就要做好的工序。

1、 The design elevation, position, and quantity of embedded parts must meet the design and installation requirements, and undergo anti-corrosion and rust prevention treatment. When the embedded parts do not meet the requirements, effective measures should be taken in a timely manner to supplement the embedded parts. This is particularly important, as we all know that pre embedding iron should be done from the beginning.

二、安裝鐵藝護欄立桿的部位時,基層混凝土不得有酥松現(xiàn)象,并且安裝標高應符合設計要求,凹凸不平處必須剔除或修補平整,過凹處及基層蜂窩麻面嚴重處,不得用水泥砂漿修補,應用高強混凝土進行修補,并待有一定強度后,方可進行鐵藝護欄的安裝。

2、 When installing the upright pole of the wrought iron guardrail, the base concrete should not have any looseness, and the installation elevation should meet the design requirements. Uneven and uneven areas must be removed or repaired flat. Over concave areas and areas with severe honeycomb and rough surfaces on the base should not be repaired with cement mortar. High strength concrete should be used for repair, and the installation of the wrought iron guardrail can only be carried out after a certain strength is achieved.

誠信不銹鋼鐵藝加工廠再次提醒您:一定要按規(guī)程安裝,才能保證我們的,不合格的安裝鐵藝護欄,會存在很多隱患,大家一定要防止。因為生命才是重要的。

Integrity Stainless Steel and Iron Processing Factory reminds you once again: it is necessary to install according to regulations to ensure our safety. Installing iron guardrails that are not qualified will pose many hidden dangers, and everyone must prevent them. Because life is the most important thing.

下面我給大家總結以下鐵藝護欄安裝時所需要注意的幾點具體細節(jié)要求:

Below, I will summarize the specific details that need to be paid attention to when installing wrought iron guardrails:

一、鐵藝護欄到達施工現(xiàn)場后按圖紙上所規(guī)定的位置及尺寸準確安裝就位,確定好標高及垂直平整度。應按照甲方要求與圖紙設計要求進行定位,確保達到設計要求與驗收規(guī)范。

1、 After arriving at the construction site, the wrought iron guardrail shall be accurately installed in place according to the position and size specified on the drawings, and the elevation and vertical flatness shall be determined. The positioning should be carried out according to the requirements of Party A and the design requirements of the drawings to ensure that the design requirements and acceptance specifications are met.

二、預埋件安裝根據(jù)圖紙設計要求和施工現(xiàn)場的實際情況準確無誤的定位,避免造成不在一條平行線上。

2、 The installation of embedded parts should be accurately and precisely positioned according to the design requirements of the drawings and the actual situation of the construction site, to avoid not being on a parallel line.

三、鐵藝護欄所提供的標準線抄水平定位安裝,預埋間距根據(jù)樓梯踏步數(shù)量及圖紙設計要求,安裝定位。

3、 The standard line provided by the wrought iron guardrail is horizontally positioned for installation, and the embedded spacing is determined based on the number of stair steps and the design requirements of the drawings.

20230121061258535.jpg

四、安裝偏差必須符合規(guī)定和設計要求,達到驗收標準。

4、 The installation deviation must comply with national regulations and design requirements, and meet the acceptance standards.

五、預埋件、鐵藝欄桿安裝必須牢固,安裝偏差根據(jù)規(guī)定和設計要求:扶手直線度<3mm,垂直度<3mm,欄桿間距誤差<3mm,對角線誤差<3mm,預埋件垂直誤差<3mm,水平誤差<3mm。

5、 The installation of embedded parts and wrought iron railings must be firm, and the installation deviation should comply with national regulations and design requirements: the straightness of the handrail should be less than 3mm, the verticality should be less than 3mm, the spacing error between railings should be less than 3mm, the diagonal error should be less than 3mm, the vertical error of embedded parts should be less than 3mm, and the horizontal error should be less than 3mm.

六、預埋件安裝定位準確無誤經(jīng)驗收后刷兩道防銹漆,再進行鐵藝護欄安裝。

6、 After the installation and positioning of the embedded parts are accurate and verified, two coats of anti rust paint will be applied before installing the wrought iron guardrail.

七、鐵藝護欄安裝完成后,接部位打磨光滑,刷兩道防銹漆,經(jīng)驗收后再做表面一致處理。

7、 After the installation of the wrought iron guardrail is completed, the joint should be polished smooth and coated with two layers of anti rust paint. After acceptance, the surface should be treated uniformly.

八、鐵藝護欄安裝運輸過程中,為防止陽臺欄桿的擦傷損壞,應做包裝防護。

8、 During the installation and transportation of wrought iron guardrails, packaging protection should be provided to prevent scratches and damage to balcony railings.

精品精品国产毛片在线看| 久久精品国产99久久丝袜| 韩日高清国内自拍| 青青在线| 国产日韩精品欧美2020区| 91久久国产精品国产精品| 成人在线免费视频| 午夜福利视频一区| 久久久啊啊啊| 嗯嗯啊啊免费在线观看无码视频| 干综合国产区| 二三区久久| 真人性做爰试看20分钟 | 亚洲视频一区二区三区| 亚洲av首页| 成年人亚洲免费视频| 夜夜看亚洲| 亚洲日韩高清无码免费观看| 亚洲冒白浆一区| 綦江县| 秋霞在线| 欧美国产综合| 69式视频免费jizz| 国产午夜视频| 天天操国产黄色大全| 无人码人妻一区二区三区免费| 香蕉99| 亚洲国产日韩欧美一区二区三区 | 狠狠操2021| 鄄城县| 色呦呦网址| 欧美亚洲综合性爱| 福利导航网址| 成人亚洲性情网WWW| 国产a级| 亚洲欧美国产日韩精品| 少妇Av一区| 男女xx网站| 无码中文字幕电影| 国产精品秘 蜜臀| 国产精品久久久久久免费观看|