常見問題
question
企業(yè)案例
case
聯(lián)系我們
- 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
- 手機(jī):15953126901
- 電話:18615254757
- 郵箱:785385551@qq.com
- 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場(chǎng)3區(qū)317
鋼結(jié)構(gòu)安裝前要做好技術(shù)交底準(zhǔn)備工作
來源:http://www.eastagcn.com.cn 日期:2022-05-08 發(fā)布人: 瀏覽次數(shù):19次
輕型鋼結(jié)構(gòu)是工程中常用的建筑材料,對(duì)工程的質(zhì)量有直接的影響,因此,安裝前需要做好安裝前的準(zhǔn)備工作,比如說相關(guān)的技術(shù)交底。下面來講講相關(guān)內(nèi)容吧。
Light steel structure is a commonly used construction material in engineering, which has a direct impact on the quality of the project. Therefore, it is necessary to make preparations before installation, such as related technical disclosure. Let's talk about the relevant content.
濟(jì)南輕型鋼結(jié)構(gòu)制作安裝前,應(yīng)認(rèn)真做好技術(shù)交底工作,它是鋼結(jié)構(gòu)制作和安裝的一項(xiàng)重要技術(shù)管理措施。通過技術(shù)交底,使施工人員能正確掌握工程內(nèi)容及設(shè)計(jì)圖紙要求,熟悉工程情況、技術(shù)要點(diǎn)、施工工藝方法:質(zhì)量標(biāo)準(zhǔn),做到施工人員胸中有數(shù),確保工程質(zhì)量。
Before ji 'nan light steel structure production and installation, should do a good job of technical disclosure, it is an important technical management measures of steel structure production and installation. Through the technical disclosure, so that the construction personnel can correctly grasp the project content and design drawings requirements, familiar with the project situation, technical points, construction technology method: quality standards, so that the construction personnel in mind, to ensure the quality of the project.
通過技術(shù)交底做好施工的情況和質(zhì)量標(biāo)準(zhǔn)的對(duì)接,施工人員可共同研討,制定符合工程應(yīng)用的方案,在安裝前,也需要做好構(gòu)件以及圖紙的核對(duì)檢查,這樣可以保證安裝的順利進(jìn)行,保證工程的質(zhì)量。
Through the technical disclosure to do a good job of construction and quality standards docking, construction personnel can jointly discuss, develop in line with the project application of the scheme, before installation, also need to do a good job of components and drawings check, so as to ensure the smooth installation, to ensure the quality of the project.
安裝技術(shù)交底的主要內(nèi)容:程概況、特點(diǎn)。工程結(jié)構(gòu)件數(shù)量。圖紙中關(guān)鍵部件的說明、節(jié)點(diǎn)情況介紹。工藝程序、方法。使用的主要機(jī)械及工具。原材料對(duì)接和堆放的要求。施工規(guī)程、質(zhì)量驗(yàn)收標(biāo)準(zhǔn)及要求。制作、安裝進(jìn)度安排、工種配合。等等。
The main content of installation technology disclosure: process overview, characteristics. Quantity of engineering structural parts. Description of key components and nodes in drawings. Process procedures and methods. Main machinery and tools used. Requirements for raw material docking and stacking. Construction regulations, quality acceptance standards and requirements. Production, installation schedule arrangement, work type cooperation. And so on.
對(duì)鋼結(jié)構(gòu)制作安裝工藝方案,施工人員也可組織研究討論,以達(dá)到意見統(tǒng)一,解決鋼結(jié)構(gòu)制作安裝中可能發(fā)生的問題。在安裝之前對(duì)加工構(gòu)建做好驗(yàn)收檢查也是能夠避免出現(xiàn)安裝問題的準(zhǔn)備工作。
Construction personnel can also organize research and discussion on the production and installation process plan of steel structure, so as to reach the unity of opinions and solve the problems that may occur in the production and installation of steel structure. An acceptance check of the fabrication build prior to installation is also a preparation to avoid installation problems.
安裝前需要做好安裝的技術(shù)交底等相關(guān)的事項(xiàng),以保證工程的順利進(jìn)行,防止出現(xiàn)因?qū)硬幻鞔_或者構(gòu)件受損等影響工程的質(zhì)量。更多內(nèi)容您可以來網(wǎng)站www.eastagcn.com.cn咨詢看看。
Before installation, it is necessary to complete installation technical disclosure and other related matters to ensure the smooth progress of the project and prevent the quality of the project from being affected by unclear docking or damage to components. For more information, please visit www.eastagcn.com.cn.